Eureka/Arcata Corridor
Comprehensive Adaptation and Implementation Plan (CAIP)
View the draft final version of the CAIP:
- Eureka-Arcata Route 101 Corridor CAIP - Draft Final - August 2026 (PDF)
- CAIP Appendices - Draft Final - August 2026 (PDF)
- CAIP Response to Public Comments - Draft Final - August 2026 (PDF)
Key Issues in the Area
The E/A Corridor is considered a priority asset in terms of risk to SLR due to its location and the need for adaptation planning.
- Most of the shoreline along the E/A Corridor have high or moderate risk of flooding.
- Flooding, storm surge, and coastal cliff erosion impact the area’s the bridges, roadways, and culverts.